![]() |
| Insulation trailer with blower |
![]() |
| Insulation hopper |
![]() | |
| Insulation being blown in to attic |
A lot of progress on the drywall as well. The second coat of mud was applied. One more final coat to go along with texturing on the ceilings.
![]() |
| Stacy on stilts |
![]() |
| Living/Dining area |





No comments:
Post a Comment