A lot of work was completed this week on the interior of the house. All of the internal walls have been framed and the wiring and plumbing work is moving right along. Sanding of all the beams and interior log walls was completed (finally!!!) and they really came out nice. After spending the last 5 or 6 days using a random orbital sander for hours each day, my arms are only now starting to stop feeling numb.
The pictures show various examples of the wiring and plumbing work that is ongoing. Also tried to show some pictures of the stain work- the ceilings and walls are being coated with two coats of a clear stain that will give them a smooth, satin finish and help protect them from UV rays as well. This will hopefully keep the original look of the white pine for many years. The last picture shows me (Dave) up in the loft applying stain, thanks to Ryan for getting a rare shot of me at work.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2010
(121)
-
▼
May
(13)
- Shed Roof on Back of House Dried In
- Interior Work
- House to Garage Electric Line
- Garage Concrete Floor Poured
- Interior Work Continues, Part 2
- Interior Work Continues
- Staining and Caulking Started
- Exterior Work Continues
- Visitor
- Everything Gets Used
- Front Side of Roof Under Felt
- Interior Cross Beams In Place
- Forest Path
-
▼
May
(13)
No comments:
Post a Comment