Interior Framing and Electric

Lots of progress last week on the house. Interior walls are completed
and 90% of the rough in electric wiring. Most of the wires are in as
well. Plumbers are due here on Monday if the weather cooperates to start
the rough in plumbing. Here are some pictures including the front door
and bay window- these won't be installed until the front concrete porch
is poured so they don't get splashed with concrete.