We visited the site on November 13th to mark and locate where the house, shop, driveways, and septic fields will be located. Doug Copenhaver from Snowy River Log Homes (SNRL) and Custom Contracting was there along with Mark McNeal from SNRL to get everything marked. Here's a shot of Doug checking out the future view.
The picture below shows Doug and Mark finishing up the final elevations for the driveway.
We're waiting for information from Allegheney Energy to get the power extended to the property- hopefully the permits will be ready and we'll be excavating and putting in the foundation before Christmas.
Next steps are getting the permits filed and should have an update on the log kit delivery date soon as well.
No comments:
Post a Comment