Sunday, August 22, 2010
Septic Work Under Way
The line for to extend the septic system to the leech field was installed this week as well. Pictures show some of the excavation work. The line was left uncovered for the inspector and the actual drain field was installed this weekend. Current plans are to turn the water on throughout the house on Monday if all goes as planned. The builder was ready this week but doesn't want to turn the water on until someone will be here for a couple of days in case there are any leaks.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2010
(121)
-
▼
August
(24)
- Lights, Water, and Cleaning
- Garage Doors Installed
- Rope Trim
- Pocket Doors
- Kitchen Appliances and Backsplash
- Central Vacuum
- Granite Installed
- Septic Work Under Way
- Final Grading
- Floors Finished
- Floors Sanded & Finished
- Stairway Railing
- More Visitors
- Countertop Tile & Cabinets Completed
- Kitchen Counter Tops Tiled
- Chimney Stone Added
- Kitchen Progress
- Interior Work Continues
- Geothermal Wells Tied Together
- Fans and More Holes
- HVAC
- Exterior Stain
- Painting (Not Staining!)
- Kitchen & Bath Cabinets Arrive
-
▼
August
(24)
No comments:
Post a Comment