Sunday, August 8, 2010
Interior Work Continues
More work this week on setting cabinets and various other finish items. Bath cabinets are set along with the counter tops and a lot of paint applied. Pictures show the master bath after the cabinets and lights were in place. Another shot shows the "Evergreen" paint color in the master bedroom. Interior doors were also stained and will be hung this week. The railing for the stairway to the basement is in place as well. These are just a few of the representative pictures of the work going on to get the cabinets, lighting, closets, and painting completed. A lot of progress. More of the final paint color pictures next week, it's hard to capture the actual colors in the blog.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2010
(121)
-
▼
August
(24)
- Lights, Water, and Cleaning
- Garage Doors Installed
- Rope Trim
- Pocket Doors
- Kitchen Appliances and Backsplash
- Central Vacuum
- Granite Installed
- Septic Work Under Way
- Final Grading
- Floors Finished
- Floors Sanded & Finished
- Stairway Railing
- More Visitors
- Countertop Tile & Cabinets Completed
- Kitchen Counter Tops Tiled
- Chimney Stone Added
- Kitchen Progress
- Interior Work Continues
- Geothermal Wells Tied Together
- Fans and More Holes
- HVAC
- Exterior Stain
- Painting (Not Staining!)
- Kitchen & Bath Cabinets Arrive
-
▼
August
(24)
No comments:
Post a Comment