Hidden Bend Retreat, Romney West Virginia

Romney, WV

Sunday, August 22, 2010

Final Grading

d.



The excavators, Larry and Doc, returned this week to bring the driveway and yard to their final grade. Gravel has been spread on the driveway which is a large circle that extends around the workshop and between the house before circling back to the gravel entrance road. A gravel parking area you can see in the second picture was also added near the house. You can see the new layer of gravel added around the shop before the two trailers we've been using were moved.

The builder's trailer has been removed from the property as his guys will be doing day trips from now on. Our trailer has been moved down closer to the house as you can see in the last picture.

There was still some more work to do on the backyard area as the trench for the septic line leading to the leech field was in place ready for the septic field install that happened this weekend. Should have some pictures of the final grade in the backyard next week.

No comments:

Post a Comment