The excavators, Larry and Doc, returned this week to bring the driveway and yard to their final grade. Gravel has been spread on the driveway which is a large circle that extends around the workshop and between the house before circling back to the gravel entrance road. A gravel parking area you can see in the second picture was also added near the house. You can see the new layer of gravel added around the shop before the two trailers we've been using were moved.
The builder's trailer has been removed from the property as his guys will be doing day trips from now on. Our trailer has been moved down closer to the house as you can see in the last picture.
There was still some more work to do on the backyard area as the trench for the septic line leading to the leech field was in place ready for the septic field install that happened this weekend. Should have some pictures of the final grade in the backyard next week.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2010
(121)
-
▼
August
(24)
- Lights, Water, and Cleaning
- Garage Doors Installed
- Rope Trim
- Pocket Doors
- Kitchen Appliances and Backsplash
- Central Vacuum
- Granite Installed
- Septic Work Under Way
- Final Grading
- Floors Finished
- Floors Sanded & Finished
- Stairway Railing
- More Visitors
- Countertop Tile & Cabinets Completed
- Kitchen Counter Tops Tiled
- Chimney Stone Added
- Kitchen Progress
- Interior Work Continues
- Geothermal Wells Tied Together
- Fans and More Holes
- HVAC
- Exterior Stain
- Painting (Not Staining!)
- Kitchen & Bath Cabinets Arrive
-
▼
August
(24)
No comments:
Post a Comment