Sunday, August 1, 2010
HVAC
A lot of the duct work for the heating and AC was installed this week and the main unit for the geothermal heat was installed. Next week, the 5 wells that were drilled and piped will be connected together and the two main lines will be brought in to the house. That's Tom, the owner of the HVAC company working to install the main unit in the first picture.
HVAC will most likely be done this week if the weather is good for the days when the outside work has to be done. The first step will be to dig down around the new wells about 6' and then connect the pipes to a manifold before being carried in to the house. Once all that work is done and tested, the wells will be buried and no longer seen. The second pictures shows pictures with measurements of the geothermal wells from the house in case we have to find them at some point in the future after they are buried. We've been trying to do this with various items to hopefully help down the road if I can remember where I filed the pictures.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2010
(121)
-
▼
August
(24)
- Lights, Water, and Cleaning
- Garage Doors Installed
- Rope Trim
- Pocket Doors
- Kitchen Appliances and Backsplash
- Central Vacuum
- Granite Installed
- Septic Work Under Way
- Final Grading
- Floors Finished
- Floors Sanded & Finished
- Stairway Railing
- More Visitors
- Countertop Tile & Cabinets Completed
- Kitchen Counter Tops Tiled
- Chimney Stone Added
- Kitchen Progress
- Interior Work Continues
- Geothermal Wells Tied Together
- Fans and More Holes
- HVAC
- Exterior Stain
- Painting (Not Staining!)
- Kitchen & Bath Cabinets Arrive
-
▼
August
(24)
No comments:
Post a Comment