Sunday, August 29, 2010
Garage Doors Installed
w
The garage doors were installed on Monday and should work out well. They're metal with an insulation panel on the inside. The board and batten siding was also delivered this week and is ready for a first coat of stain. Hope to start this the week after next, the stain has been ordered and should arrive in a day or two.
You can see the stacks of wood in the garage bays. Plans are to spread the wood out on sawhorses in the garage and the shop above to apply the stain. Still undecided on the approach I'll take for putting up the siding , whether to rent scaffolding or some other type of lift or to just use an extension ladder.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2010
(121)
-
▼
August
(24)
- Lights, Water, and Cleaning
- Garage Doors Installed
- Rope Trim
- Pocket Doors
- Kitchen Appliances and Backsplash
- Central Vacuum
- Granite Installed
- Septic Work Under Way
- Final Grading
- Floors Finished
- Floors Sanded & Finished
- Stairway Railing
- More Visitors
- Countertop Tile & Cabinets Completed
- Kitchen Counter Tops Tiled
- Chimney Stone Added
- Kitchen Progress
- Interior Work Continues
- Geothermal Wells Tied Together
- Fans and More Holes
- HVAC
- Exterior Stain
- Painting (Not Staining!)
- Kitchen & Bath Cabinets Arrive
-
▼
August
(24)
No comments:
Post a Comment