Sunday, July 25, 2010
Tile Floors
Randy, the tile installer spent a busy 4 days at the house getting all the tile floors down. The floors will be grouted later but so far, they look great and we're happy with the color selections we've made now that we see them in place and in natural light. Here are some pictures of the tile work.
The first picture shows the mudroom with the durarock that is set first to provide a solid surface for the tile. Tiles are then laid using thinset mortar. The second picture is the upstairs guest bath, next is the master bath, and the last picture shows the kitchen. The tile in the master bath is the same as we're using in the mudroom.
You also get a good view of the wood interior doors we're using throughout the house in the kitchen photo. These are double doors for the pantry. Will show a picture of the doors with the first coat of stain in another post.
You can click on the pictures to get a larger version of the photo.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2010
(121)
-
▼
July
(22)
- Deck Railings Started
- Wood Floors
- Geothermal Wells Drilled
- Interior Wood Doors
- Tile Floors
- Stairwell Set
- House Interior Work
- Workshop Progress
- Propane Tank Buried
- Trim Stain
- Exterior Lights
- Garage/Shop Started
- Drywall Work
- Roof & Gutters Completed
- Drywall Delivered
- Fans and Lights
- Roof Vent Installed
- Bathroom Ceilings
- Deck & Stair Work Continues
- Basement Stairs & Walls
- More Staining
- Wood Stove Chimney
-
▼
July
(22)
No comments:
Post a Comment