Sunday, July 18, 2010
House Interior Work
More progress inside the house. The drywall has been completed and is ready to be painted, oh no, another decision to make on the colors to use! The trim for the windows and doors has been pre-stained and is ready to go, the carpenters will start to install the trim this week. Here are a couple of pictures of the drywall.
The stairs to the loft were delivered and should be set in place next week. These are made from heavy pine timbers (treads are about 3 1/" thick) and will be stained with a natural finish to match the loft flooring which is also pine.
Butch started painting the trim on the windows as well, the sun made the exterior shot a bit interesting I thought. The hardwood flooring installed visited the house to get the final measurements last week as well. We'll be using random width red oak flooring throughout the first floor except for the kitchen and baths which will be tile. We're trying to get all the high staining work completed so we can get the scaffolding out of the house before the flooring crew arrives. Enjoy the pictures.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2010
(121)
-
▼
July
(22)
- Deck Railings Started
- Wood Floors
- Geothermal Wells Drilled
- Interior Wood Doors
- Tile Floors
- Stairwell Set
- House Interior Work
- Workshop Progress
- Propane Tank Buried
- Trim Stain
- Exterior Lights
- Garage/Shop Started
- Drywall Work
- Roof & Gutters Completed
- Drywall Delivered
- Fans and Lights
- Roof Vent Installed
- Bathroom Ceilings
- Deck & Stair Work Continues
- Basement Stairs & Walls
- More Staining
- Wood Stove Chimney
-
▼
July
(22)
It's really coming along! I like the contrast in the light ceilings and the darker beams.
ReplyDelete