Friday, July 2, 2010
Drywall Delivered
Late on Thursday, the drywall was delivered and placed in the rooms where it will be used. The crane on the truck is a pretty neat piece of machinery allowing the material to be moved easily. The window on the second floor is able to be removed for cleaning so it was taken out to allow some of the drywall to be placed on that level.