On Friday, the septic install for the guesthouse was inspected and the contractor was able to finish covering the tank and drain field. Install went very smooth, here are a couple of pictures as the final grading was finished.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2013
(101)
-
▼
August
(14)
- Guesthouse Crawlspace Footings Poured
- First Food from the Oven!
- Swing for the Patio
- TIle on the Pizza Oven
- Guesthouse Crawlspace Excavation
- Pizza Oven, Second Coat of Stucco
- Oven Curing
- Pizza Oven Stucco
- Guest House Staked for Excavation
- First Fire in the Pizza Oven
- Pizza Oven Arch
- Sparky Adopted
- Pizza Oven Progress
- Septic Completed
-
▼
August
(14)
No comments:
Post a Comment