Our local builder and excavator came out last night to lay out the stakes to start excavating for the crawl space for the guest house. The trenches for the electric and water connections will also be done.
Here's a picture looking from the road in to the site, you can see the corner stakes for the front of the house (actually the porch).
These next three shots are from where the porch will be, first looking to the right up the road, then across the road, then to the left towards the existing house. You can click on the pictures to get a larger view. A bit hard to see the detail but wanted to give a starting point.
The excavator hopes to begin digging this week, once this is complete, the builder will begin to layout the footers for the crawl space walls.
Will try to post progress over the next few months as we move along.
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2013
(101)
-
▼
August
(14)
- Guesthouse Crawlspace Footings Poured
- First Food from the Oven!
- Swing for the Patio
- TIle on the Pizza Oven
- Guesthouse Crawlspace Excavation
- Pizza Oven, Second Coat of Stucco
- Oven Curing
- Pizza Oven Stucco
- Guest House Staked for Excavation
- First Fire in the Pizza Oven
- Pizza Oven Arch
- Sparky Adopted
- Pizza Oven Progress
- Septic Completed
-
▼
August
(14)
No comments:
Post a Comment