Here's a picture of a floating dock we built for the river camp. 8'x8', will see how well it works as the water levels change.
Sunday, June 21, 2015
River Camp Dock
Here's a picture of a floating dock we built for the river camp. 8'x8', will see how well it works as the water levels change.
Thursday, April 23, 2015
Alpaca Shearing
spitting and not much crying. Matt Best did the shearing again for us
this year and all went well. It's a cold week here with temps in the
30's at night so put coats on the boys when we shut the barn for the night.
Wednesday, April 8, 2015
Salt & Pepper Box
Donna wanted a Salt & Pepper box to set by the stove- made this one up
on the CNC machine. The lids are walnut from a neighbor's property and
the box body is oak from our house in Leesburg.
on the CNC machine. The lids are walnut from a neighbor's property and
the box body is oak from our house in Leesburg.
Cheese Press
Made a cheese press and made our first cheese. It's a farmhouse cheddar
that will need to age for about 45-60 days before it's ready.
that will need to age for about 45-60 days before it's ready.
Drywall Plaster Started
First coat of drywall mud and tape has been applied- will put on
additional coats over the next few days. After the plaster is done,
we'll install all the interior trim and hang the doors before getting in
the paint crew.
additional coats over the next few days. After the plaster is done,
we'll install all the interior trim and hang the doors before getting in
the paint crew.
Drywall Hung
and wife team did the work over two long days.
House Exterior
Here are some pictures of the outside of the house which is all
completed except for the garage doors which hopefully will be installed
next week.
completed except for the garage doors which hopefully will be installed
next week.
House Basement
A lot of work has been completed on the house, not as many pictures!
These are shots of the basement and garage area. Well pumps and pressure
tanks are installed and the main electric panel is wired. Most of the
HVAC is done and the rest should be completed in the next week or so.
These are shots of the basement and garage area. Well pumps and pressure
tanks are installed and the main electric panel is wired. Most of the
HVAC is done and the rest should be completed in the next week or so.
Sunday, February 15, 2015
Interior Framing and Electric
Lots of progress last week on the house. Interior walls are completed
and 90% of the rough in electric wiring. Most of the wires are in as
well. Plumbers are due here on Monday if the weather cooperates to start
the rough in plumbing. Here are some pictures including the front door
and bay window- these won't be installed until the front concrete porch
is poured so they don't get splashed with concrete.
and 90% of the rough in electric wiring. Most of the wires are in as
well. Plumbers are due here on Monday if the weather cooperates to start
the rough in plumbing. Here are some pictures including the front door
and bay window- these won't be installed until the front concrete porch
is poured so they don't get splashed with concrete.
Smoked Salmon
We bought a smoker and have been enjoying ourselves. It's a Bradley
Digital 4 Rack unit. Used small pucks made from sawdust in various wood
types for the smoke generation. Everything has been great so far, last
night, we smoked a salmon fillet. Great flavor, very flaky and stayed moist.
Digital 4 Rack unit. Used small pucks made from sawdust in various wood
types for the smoke generation. Everything has been great so far, last
night, we smoked a salmon fillet. Great flavor, very flaky and stayed moist.
Metal Roof Installed
Our contractors installed the metal roof for the house last week. Here
are some shots as they worked.
are some shots as they worked.
Kitchenette Cabinets Completed
Finished up the cabinets for the kitchenette next to the theater room.
Finished and installed the wine & glass rack this morning. It was a fun
project!
Finished and installed the wine & glass rack this morning. It was a fun
project!
Sunday, February 8, 2015
Kitchenette Nearly Done
Grouted the tile and installed the sink in the kitchenette- moved the
popcorn machine and fridge back in so ready to use! Still have a wall
rack to make and going to add a door to the one cabinet that is
currently open. Don't like the look of the open cabinet. Here's a picture.
popcorn machine and fridge back in so ready to use! Still have a wall
rack to make and going to add a door to the one cabinet that is
currently open. Don't like the look of the open cabinet. Here's a picture.
House Backfill
yesterday. Came out better than expected. Will have a nice driveway and
will also have access across the back of the house to the road so we
won't have to have such a large area to turn a car around in the yard. Here
are some pictures. First one shows how I had to clear out the snow that we
had shoveled out of the house in to the basement hole- needed to be cleared out
to put down the final gravel and make sure it didn't settle when the 5 foot high
pile of snow melted. I did cheat a bit and got my small backhoe in there to remove
most of the snow and just had to finish with a shovel.
Front view |
Easy access to yard from front porch |
Thursday, January 29, 2015
Cabinets Installed in Kitchenette
Cabinets mounted in the basement kitchen area next to theater. Seem to
fit okay, just have some final trim work, installing the sink and
plumbing connections, and then a counter top to finish. Need to get some
handles for the drawers in the cabinets as well. Most likely will make
the counter top from tile as I have a bit of this from previous
projects that should work.
fit okay, just have some final trim work, installing the sink and
plumbing connections, and then a counter top to finish. Need to get some
handles for the drawers in the cabinets as well. Most likely will make
the counter top from tile as I have a bit of this from previous
projects that should work.
Truss View from Inside House
were set. Hard to recognize anything but this is looking from the back
sliding glass door in towards the kitchen/stairwell.
A lot of wood!
Trusses Set on House
Got a break in the weather today and we were able to get a crane in to set
the trusses on the house. Job went smoothly, only took about 3 hours to
get them all in place. Temperature started about 9 degrees but had warmed to 35
by mid day.
We used the same local crane company, D & B, that we used when we did the
guest cabin.
the trusses on the house. Job went smoothly, only took about 3 hours to
get them all in place. Temperature started about 9 degrees but had warmed to 35
by mid day.
We used the same local crane company, D & B, that we used when we did the
guest cabin.